44,432 sf (22,216 sf per floor) buildout of the 3rd and 4th floor shell spaces added 72 patient rooms to the hospital, including all the required ancillary areas. The construction itself was sequenced to minimize impact to existing operations and an additional elevator tower was built to support better material and patient flow. The project is designed and built to LEED Gold criteria.